From the 1990s subdivisions off the Peakway to the new-build irrigation rows in Sweetwater and Bella Casa, Apex runs its own cross-connection program — and we keep your assembly tested, repaired, and reported to the Town on time.
Annual commercial certifications and every-third-year residential irrigation tests, sized to the Town of Apex schedule.
Rebuilds and part swaps on assemblies that fail at test — common in the aging 1990s–2000s subdivisions reaching replacement age.
Full assembly swaps when a unit is beyond rebuild, matched to your meter and line size.
Insulated, locking enclosures that protect the device from freeze and tampering year-round.
Apex calls itself the Peak of Good Living, and that good living runs on a lot of irrigation. Drive through Haddon Hall, Scotts Mill, or any of the newer pockets ringing the Peakway and you’ll see backflow assemblies on nearly every lawn — which is exactly why the Town of Apex takes cross-connection control seriously. Every one of those devices is the barrier that keeps fertilizer, pond water, and irrigation backflow out of the drinking water your neighbors rely on.
That drinking water is worth protecting. Apex pulls from Jordan Lake and treats it at the jointly-owned Cary/Apex plant, then distributes it town-wide. A single failed assembly on a hot, high-demand summer day can let contaminated water siphon back into that clean supply — the precise scenario the testing rules exist to prevent.
We handle the full lifecycle so you’re not juggling vendors: we test the device, and if it fails we repair or replace it on the spot when we can. Apex’s split housing stock means we see both ends of the range — tired assemblies in established 1990s and 2000s neighborhoods that have simply aged out, and dense new-construction rows in the 2010s and 2020s subdivisions where irrigation is standard. Either way, we file the passing report electronically and confirm it landed.
Apex requires the passing report be submitted electronically after a passing test. We confirm the current filing process and deadline, file it for you, and confirm receipt — you don’t chase the paperwork.
Apex runs its own cross-connection control program rather than handing it off — so the schedule, the deadlines, and the reporting process are all set locally. Here is how it breaks down for the two property types we serve most.
Commercial assemblies must be tested annually. Residential irrigation assemblies now test every three years under North Carolina Senate Bill 166 — with one important exception: if your system feeds a booster pump or a chemical-feed setup, it still tests every year.
In every case the certified tester submits the passing report electronically, and submission windows and deadlines can change. We confirm the current filing process and your specific deadline, run the test, and file the result — so a missed cutoff never puts your water service at risk.
We check whether your assembly is on the annual commercial or three-year residential schedule, and flag booster-pump or chemical-feed exceptions.
A certified tech tests the assembly at your property anywhere from Bella Casa to Scotts Mill, usually same-day.
If the device fails, we rebuild or replace it — then retest to confirm it passes.
We submit the passing report to the Town and confirm it was received.
From the Peakway loop to the newest subdivisions near the planned UNC Health/Duke children’s hospital, we cover all of Apex and the surrounding Triangle.
Certified · paperwork handled · flat-rate pricing.